Section Assignment has been revamped completely and it is a much simpler & easier process in Render 3 comparing to Render 2. For section assignment, go to Project Configuration page, click on Assign Sections.
Once there, you will see two tabs in the upper center of the page:
Section View: In this view, you will have all the sections available in the scope showing up as a list. All the sections will be in numerical order by default. Each section entry has a space on its right-side, marked by 'Drag team here'. All you have to do is drag your desired team from the right-side panel that you want to assign to that section.
To assign sections in this view - drag the team you want to assign to section from the right-side panel and place it on the 'Drag team here' box of the desired section.
To adjust priority, grab the two horizontal bars (like equal '=' sign) on the rightmost side of the assigned section and drag it to the position of priority you want it to be. The higher the section is the more priority it gets.
To remove an assignment, simply click on the Trashcan button on the right side of the section, next to the team it was assigned to.
Team View: In this view, you get separate pages for each team. On the left-side panel you can select each team. Once a team is selected you will get empty slots for sections in the middle. Sections that are available for assignment will be available on the right-side panel.
To assign sections in this view -
- Select the team you want to assign a section on the left-side panel.
- Drag the section from the right-side and put it in the empty slot in the middle marked by 'Drag section here'.
To adjust priority, grab the two horizontal bars (like equal '=' sign) on the rightmost side of the assigned section and drag it to the position of priority you want it to be. The higher the section is the more priority it gets.
To remove an assignment, simply click on the Trashcan button on the right side of the assigned section.
Once you have completed assigning your sections, you can save the changes by clicking on the Next button marked by a tick mark on the lower right. To discard all the assignments, click on the Back button at the upper left.
This completes the steps involved in project configuration and the teams are ready to begin translating!